Fort Irwin Water Treatment Plant & Distribution System
CLIENT
CDM Smith
PROJECT VALUE
$98M
PROJECT COMPLETION
2016
SERVICES
Quality Control Testing
Materials Inspection
The Fort Irwin Water Treatment Plant and Distribution System was designed to treat 6 million gallons per day and remove contaminants found in Fort Irwin's ground water, in conformance with federal and state requirements.
Mountain Group provided quality control testing and inspection services during the construction of the $98M USACE Wastewater Treatment Plant at the Fort Irwin National Training Center.
Construction included a control building, a chemical building, two 1M-gallon water tanks, and an assortment of chemical tanks, filtering/clarifying equipment, lime-softening filter building, reverse osmosis feed water storage and pump station, brine treatment facility, mechanical evaporator feed tank, concentrate equalization basins, evaporations ponds (lined), lime sludge lagoons, concrete, and ancillary onsite and offsite improvements.
Our personnel provided the geotechnical testing and inspection, special inspection of the concrete, masonry, and structural steel/bolting. Materials testing and laboratory testing services were also provided.